Work inside the Auditorium is underway.  During January, mechanical equipment, ducts, and water piping will be installed and the interior walls will be built.

The long architectural concrete wall has been extended past the Auditorium structure.  Alongside it is the water channel, which will continue through the new Entry Plaza.

Work on the building's geothermal system has been completed, and it will be turned on this month.

Top right: View of water channel under construction.

Bottom right: View of Auditorium exterior.